Stork

The fastest turbine inspection for FPSO converter

Information

Client

No name

Region

Dubai - United Arab Emiratest

Industry

Power

Associated capabilities

Project Description

During conversion of a tanker vessel to an FPSO, our customer asked Stork Gears & Services to perform an inspection on the cargo pump turbines. Inspection resulted in repair of the three turbines under DNV classification in the shortest possible timeframe, followed by on-site commissioning. 

Challenge

  • On-site inspection
  • Re-blading of rotor
  • Repair of diapraghms by precision welding and blending
  • Manufacture of new journal bearings, labyrinths and gears
  • On-site installation and testrun with vibration monitoring and radial shaft displacement

Stork provided the customer with the fastest possible delivery time enabling the client to stay on schedule. The vessel has been operating the three turbines without problems for 2 years now. All repairs were completed under DNV classification within 4 months. 

Project details

Market segment: FPSO converter

Gearbox: Vertical cargo pump turbine; MHI (Mitsubishi Heavy Industries); CNV 320G
2300 kW; 7500 / 1250 RPM
1 The fastest turbine inspection for FPSO converter