The fastest turbine inspection for FPSO converter
Project Description
During conversion of a tanker vessel to an FPSO, our customer asked Stork Gears & Services to perform an inspection on the cargo pump turbines. Inspection resulted in repair of the three turbines under DNV classification in the shortest possible timeframe, followed by on-site commissioning.
Challenge
- On-site inspection
- Re-blading of rotor
- Repair of diapraghms by precision welding and blending
- Manufacture of new journal bearings, labyrinths and gears
- On-site installation and testrun with vibration monitoring and radial shaft displacement
Stork provided the customer with the fastest possible delivery time enabling the client to stay on schedule. The vessel has been operating the three turbines without problems for 2 years now. All repairs were completed under DNV classification within 4 months.
Project details
Market segment: FPSO converter
Gearbox: Vertical cargo pump turbine; MHI (Mitsubishi Heavy Industries); CNV 320G
2300 kW; 7500 / 1250 RPM
Gearbox: Vertical cargo pump turbine; MHI (Mitsubishi Heavy Industries); CNV 320G
2300 kW; 7500 / 1250 RPM